Stuck in Traffic?
Enter to Win a $50 Amazon Gift Card.
Picking a NEW WINNER Every 2 Weeks
One Entry Per Person
Your entry is valid for ALL drawings
Check Out Our Listing You’re Passing By:
Why You’re Sitting Here
You’re not stuck because of the home — this is a city trail project currently underway. They’re building the ChoiceOne Bank Trail, a new paved walking/biking path between Fenton and Linden along Silver Lake. Work is happening during daytime hours, so expect intermittent one-lane traffic control through spring and summer 2026.
What’s Causing the Delays
Crews are currently working along the lake to build the wood boardwalk section
Work happens 7:00am–5:00pm
During work hours, traffic is reduced to one lane and controlled by flaggers or temporary lights
Outside of work hours, both lanes are open
How long will this last?
Boardwalk construction: winter (weather permitting)
Asphalt paving: spring / summer 2026
Trail expected to open: late summer 2026
Until then, expect occasional backups during daytime work hours.
Why it’s Worth It
When finished, this trail will:
Connect Fenton and Linden safely for walkers and cyclists
Add a scenic route along Silver Lake
Improve long-term traffic flow and accessibility in the area
In the meantime… since you’re already stopped, you might as well enter the giveaway! 😉